sl.no |
Name of the project |
SLSWA No. |
Dated |
Basis |
Detailed Remarks |
Present Position |
1 |
Impovements to Dharwad-Alnawar-Ramnagar Road (SH-34) on BOT basis |
1 |
19.09.2007 |
BOT |
Approved |
completed,COD Dec,2012 |
2 |
Construction of Expressway (State Highway,Special) from Outer Ring Road to International Airport in Devanahalli Taluk. |
1 |
19.09.2007 |
BOT |
Approved |
|
3 |
Impovements to Chikkanayakanahalli-Tiptur-Hassan road (Partly MDR & partly SH) |
1 |
19.09.2007 |
BOT |
Approved |
|
4 |
Improvements to State Highway (SH 10) from Maharashtra Border to Andhra Pradesh Border in Gulbarga District |
1 |
19.09.2007 |
BOT |
Approved |
completed, Dec,2012 |
5 |
2nd Stage development of Karwar Port through Participation under "BOOT" concept: |
2 |
20.11.2007 |
BOOST |
Approved |
|
6 |
Development of Honavar Port in District Uttara Kannada of Karnataka Martime State on Build Own Operate Share and Transfer (BOOST) basis |
3 |
01.04.2008 |
BOOST |
Approved |
|
7 |
Development of Modern Sea Port at 1st Stage Malpe on the coastline of Karnataka Martime State on Buil Own Operate Share and Transfer (BOOST) basis |
4 |
09.09.2008 |
BOOST |
Approved |
|
8 |
Development of Traffic and Transit Management Centre at Hebbal on DBOT basis. |
4 |
09.09.2008 |
DBOT |
Approved |
|
9 |
Development of KSRTC offices, guesthouse and Commercial Complex on KSRTC site at Mangalore on PPP Basis |
5 |
17.02.2009 |
DBOT |
Approved- under the common conditions as mentioned under 3.1.8 KRDCL-Transport department) |
completed, 2016 |
10 |
Commercial Development on KSRTC sites at Hassan and Channarayapatna on Public Private Partnership PPP Basis |
5 |
17.02.2009 |
DBOT |
Approved- Hassan underthe common conditions as mentioned under 3.1.8. |
|
11 |
Development of Bus Station and Commercial Complex on KSRTC Site at Puttur on PPP basis |
5 |
17.02.2009 |
DBOT |
Approved- Underthe common conditions as mentioned under 3.1.8.(KRDCL-Transport department) |
completed, 2016 |
12 |
Development of Passenger amenities and Commercial complex on KSRTC site at Chitradurga on PPP basis |
5 |
17.02.2009 |
DBOT |
Approved- But informed to re-examine the necessity & requirement of each component now proposed.The common conditions as mentioned under 3.1.8. |
|
13 |
Development of bus Station and Commercial Complex on NWKRTC site at Hubli PPP basis |
5 |
17.02.2009 |
DBOT |
But instructed that traffic impact assessment and management be reexamined before proceeding with further actions for bidding, subject to common conditions as mentioned under 3.1.8.Approved- |
|
14 |
Development of bus station and commercial complex on NWKRTC site at BELGAUM on PPP basis |
5 |
17.02.2009 |
DBOT |
Approved- Underthe common conditions as mentioned under 3.1.8. |
|
15 |
Development of bus station and commercial complex on NEKRTC site at GULBARGA on PPP basis |
5 |
17.02.2009 |
DBOT |
Approved- Under the common conditions as mentioned under 3.1.8. |
|
16 |
Establishment of KLAC office through development of 1.606 acres land at Hosur Main road, Bangalore on PPP basis |
5 |
17.02.2009 |
BOT |
Approved |
|
17 |
Development of Ring road connecting Ananthpur Road and Bangalore Road at Bellary on PPP basis |
5 |
17.02.2009 |
DBOT |
Approved- Committee asked the administrative agency to place the proposal before SHLCC. |
|
18 |
Development of Green Field Port under 'Swiss Challenge' at Haldipur by M/s. MEL,Bangalore |
6 |
19.09.2009 |
Swiss challenge |
Approved- Permisssion to proceed with the necessary DPR studies & submit a detailed proposal to GOK. |
|
19 |
Development of Green Field Airport at Bellary |
6 |
19.09.2009 |
|
Approved- The SWA advised IDD to seek VGF from GOI. |
|
20 |
Development of Intermodal Transit Center at Kempegowda Bus Station(KSRTC) |
6 |
19.09.2009 |
BOT |
Approved- Since the project has far reaching consequences, SWA advised that a sub-committee headed by Principal Secretary, IDD inolving all the stake holders be constituted to take a view on the project on an expeditious basis. |
|
21 |
Railway Siding by JSW - Torangalu-Sulthanapura (11 km) Swamihalli (37 km) |
7 |
19.04.2010 |
|
In principle approval given 1. IDD / KRIDE to proceed with DPR studies of the project, 2. to move the Ministry of Railways in matter. 3. To take forward the project on PPP mode, as & when Ministry of Railways clears the projects. |
|
22 |
Industrial Park VADA |
7 |
19.04.2010 |
|
In principle clearance given |
|
23 |
Gas Based Power Projects at Davanagere and Tumakuru |
7 |
19.04.2010 |
|
In principle clearance given |
|
24 |
Talaguppa Honnavara, Bijapur – Shabhad, Dharwad – Belgaum Doubling |
7 |
19.04.2010 |
|
In principle clearance given 1. IDD to go ahead in taking the project forward under PPP framework as and when the Ministry of Railways clears the project. 2. To explore the option of a line from Bagalkot to Shahabad |
|
25 |
Logistic Architecture |
7 |
19.04.2010 |
|
In principle approval given - Agreed that studies are required for development of these projects & gave its permission to go ahead with master plan / feasibility study. |
|
26 |
Bangalore Metro Phase-II |
7 |
19.04.2010 |
|
Approved - for conducting studies |
|
27 |
City Gas Distribution |
7 |
19.04.2010 |
|
Approved - 1. For forming a Joint venture with GAIL Gas ltd for providing gas distribution systems in Kar. 2. For appointment of KSIICD as a Nodal agency of the state. 3. Authorise IDD of GOK being nodal dept. |
|
28 |
IMTC at Majestic Area |
7 |
19.04.2010 |
|
Approved - 1. Implementation of IMTC project at Majestic area subject to the condition that KSRTC shll take action to establish satellite bus stations in all major roads leading to city at appropriate places in the vicinity of BBMP areas. |
|
29 |
SH-132 Road Project (Bellari city to Andhra Pradesh Border) |
7 |
19.04.2010 |
|
Proceed- further as per cabinet approval. |
completed March,2014 |
30 |
Development of Sports, Lesiure and Recreation Centre in Peripharals of Bangalore |
8 |
23.06.2010 |
|
In principle approval given - The committee agreed in principle for the Youth services dept to proceed further project development |
|
31 |
Development of Ring road and River Front Development in Mangalore (Mangala Corniche) |
8 |
23.06.2010 |
|
In principle approval given 1. To take up the project on PPP. 2. KAP beappointed as Nodal Agency to implement the project 3. To retain KIPDC as project advisor to advise KAP in project development and implementation |
|
32 |
(1). Development of Road from NH-63 - Ginigere - Gangavathi to Sindhanur (2). Chintamani to Tadgal Road on to Andhra Pradesh Border in Chikkaballapura District (SH-82) (3). Devasuguru - Chikkasuguru - Raichur - Yeragere to Manthralaya Bridge (SH-13) (4). Lingasugur - Kalamala to Raichur(SH-20). (5). Shivamogga - Honnalli to Harihara. |
9 |
06.10.2010 |
|
Approved- i. To undertake the development / improvements of the above mentioned 5 project roads. ii. To appoint KRDCL as the Nodal agency for implementation of the above Road projects. iii. To avail the services of iDeCK as Project management Consultants for the above projects. iv. To move GOI for VGF assistance in respect of the above projects. v. To initiate all that action required to take forward the above projects in seeking the approvals of SHLCC and cabinet. vi. To get all the bidding documents, transaction advisory documents prepared by the transaction advisors and get the same processed in the direction of inviting competitive bids in a transparent manner. |
1 1) completed Sep,2015 |
33 |
Development of VADA under PPP Framwork through MISP |
9 |
06.10.2010 |
|
In principle approval given i) Approval in-principle to undertake the development of VADA through MISP model. ii)To appoint KSIIDC as the nodal agency to implement the VADA through MISP model. iii)To appoint either iDeCK /other empanelled TA to develop the MISP concept in detail, phase out the investment to implement the scheme in3 phases and prepare necessary documents to invite Expression of Interests and selection of MISP partner. iv)To suggest an appropriate land use planning for VADA taking into consideration the clearances already accorded for mega projects by the SLSWA, SHLCC and MoU’s entered into during GIM. v)To initiate all that action required to take the project forward in moving the SHLCC and the Cabinet seeking the requisite approvals. |
|
34 |
(1). Development of TTMC at Jayanagar 4th Block (2).Development of TTMC at Indiranagar (3). Development of TTMC at Kathriguppe (4) Bus Terminal and Commercial Development at Malleshwaram |
9 |
06.10.2010 |
|
In principle approval given- i. Clear the project in-principle for implementationunder PPP framework. ii. Appoint BMTC as the nodal agency. iii. Initiate all that action required to take the project forward. iv.Move the SHLCC and the cabinet seeking the approval to take the project forwardunder the PPP framework. v.Form an interface committee that will take up issues of importance to both concessioning authority and concessionaire. |
|
35 |
Development of four Super Specality Hospital in Bengaluru |
11 |
08.05.2012 |
|
In principle approval given |
|
36 |
Development of TTMC at Yelahanka and Electronic City |
11 |
08.05.2012 |
|
In principle approval given |
|
37 |
Development of TTMC at Jayanagar 4th Block |
11 |
08.05.2012 |
|
Approved |
|
38 |
Development of Commercial Complex in Gulbarga by GUDA |
12 |
06.03.2013 |
|
Approved- To do the Analysis on Concession Payment |
|
39 |
Improvements to SH-62, 76, 57 from Hirekeruru to Ranebennur (on NH-04)- 58.3 km |
12 |
06.03.2014 |
|
In principle approval given |
|
40 |
Improvements to Mundaragi-Hadagali-Harapanahalli-SH-45,47 |
12 |
06.03.2015 |
|
In principle approval given |
|
41 |
Improvements to Bantavala-Belthangadi SH-64 |
12 |
06.03.2016 |
|
In principle approval given |
|
42 |
Improvements to Yelahanka AP border Section |
12 |
06.03.2013 |
|
Approved |
on going project, commercial operations started- October, 2018 |
43 |
Development of Road from Nelamangala to Chikkaballapura Section |
12 |
06.03.2013 |
|
Approved |
|
44 |
Development of Road from Hosakote - Malur - TN Border |
12 |
06.03.2013 |
|
Approved |
|
45 |
Instalation Commissioning and O&M of Municipal Solid Waste at Ramuhalli Post at Subbarayanapalya, Bengaluru |
12 |
06.03.2013 |
|
In principle approval given |
|
46 |
Development of Belikeri port |
14 |
27.11.2014 |
|
Approved |
|
47 |
Development of Commercial Complex at Mudabidre |
15 |
23.05.2015 |
|
In principle approval given |
|
48 |
Development of Malavalli-Maddur-Huliyurudurga-Kunigal-Tumukuru-Koratagere-Madugiri-Pavagada Road |
15 |
23.05.2016 |
|
Approved |
|
49 |
Development of Mudhol-Mahalingapura-Kabburu-Chikkodi-Nippani-Maharastra Border Road |
15 |
23.05.2017 |
|
Approved |
|
50 |
Providing Tourism Infrastructure near Badra Dam |
16 |
16.06.2016 |
|
Approved |
|
51 |
Providing Tourism Infrastructure near Hidkal Dam |
16 |
16.06.2016 |
|
Approved |
|
52 |
Providing Tourism Infrastructure near Mallaprabha Dam |
16 |
16.06.2016 |
|
Approved |
|
53 |
Setting of Blown Film Manufacturing Unit at Challaghatta |
16 |
16.06.2016 |
|
In principle approval given |
|
54 |
Setting of Corrugated Box Manufacturing Unit at Challaghatta |
16 |
16.06.2016 |
|
In principle approval given |
|
55 |
Deep freezer of Capacity 2000/3000 MT at Channarayapatna, |
16 |
16.06.2016 |
|
In principle approval given |
|
56 |
Automated Milk Convertion Plants at Dharwad |
16 |
16.06.2016 |
|
In principle approval given |
|
57 |
Automated Mega Cattel Feed Manufactruing Plant of Capacity 500 MT per day at Mandya and Kolar |
16 |
16.06.2016 |
|
In principle approval given |
|
58 |
Ultra High trated - Health Drink project at Mandya |
16 |
16.06.2016 |
|
In principle approval given |
|
59 |
Establishing of Solar Pannels on Rooftop of Storage Houses by KSWC |
16 |
16.06.2016 |
|
In principle approval given- Approval was accorded to prepare DPR and placed before the Cabinet |
|
60 |
Tourism Infrastructure facility at Gorur Dam |
16 |
16.06.2016 |
|
In principle approval given |
|
61 |
Tourism Infrastructure facility at Kabini Reservoir (Kabini Vanasiri) |
16 |
16.06.2016 |
|
In principle approval given |
|
62 |
Development of seven Warehouses of KSWC as cold storages on PPP |
18 |
11.01.2018 |
|
In principle approval given |
|
63 |
Operation and Maintenance of KSWC Warehouses on PPP |
18 |
11.01.2018 |
|
Approved |
|
64 |
Development of bus terminal along with Commercial complex in Kanakapura bus stand |
18 |
11.01.2018 |
|
Approved |
|
65 |
Setting up of Milk storage and packing unit at Sirsi |
18 |
11.01.2018 |
|
Approved |
|
66 |
Development of Krishnaraja Sagar Brundavan Garden under PPP Model
|
20 |
26.11.2019 |
|
Approved |
|
67 |
Development of Aquarium under SWISS Chanllenge Model by Mysuru Zoo Authority
|
20 |
26.11.2019 |
SWISS Challenge |
Approved |
|
68 |
Development of Hullikere Garden under PPP Model at Koppal
|
20 |
26.11.2019 |
|
Approved |
|
69 |
Release of 3rd installment of KVGF -KRDCL - Yelahanka - A.P.Boarder |
20 |
26.11.2019 |
|
Approved |
|
70 |
Development of Eco-Tourism at Manchinbele Dam (Ramanagara District)
|
20 |
26.11.2019 |
|
Approved |
|
71 |
Development of Health and Wellness City, Eco-Tourism City at Tadadi Port
|
20 |
26.11.2019 |
|
Approved |
|
72 |
Development of Five Star Hotel Complex, Ropeway and Stations near Jog Falls of Sagara Taluk on PPP model
|
21 |
09.06.2021 |
DBFOT |
Approved |
|
73 |
Proposal of M/s BACL to develop Convention and Exhibition Centre at Kempegowda International Airport
|
21 |
09.06.2021 |
BOOT |
Approved |
|
74 |
Installation of PET CT Scan (Digital) Unit at KIDWAI Memorial Institute of Oncology
|
21 |
09.06.2021 |
BOOT |
Approved |
|
75 |
Udupi Urban Digital Infrastructure Project |
21 |
09.06.2021 |
|
In-Principle Approval
|
|
76 |
Development of Pheripheral Ring Road to Bangalore city |
21 |
09.06.2021 |
|
Approved |
|
77 |
Road Project connecting Sindhanoor-Raichur-Hosur-Siddaram Pura-Gadwal Cross Road-Chandrabanda Cross Road-Drampura Cross Road and Yaramarus to NH-167
|
21 |
09.06.2021 |
|
Approved |
|
78 |
Development of Affordable Housing in PPP model for EWS/MIG-I/LIG/ Industrial & Service Sector Workers
|
21 |
09.06.2021 |
|
In-Principle Approval
|
|
79 |
Development and operation of Passenger Ropeways at Nandi Hills in Karnataka on DBFOT Basis
|
22 |
12.10.2021 |
DBFOT |
Approved |
|
80 |
Modernisation of Sree Kanteerava Sports Stadium Complex and Development of a Commercial Complex
|
22 |
12.10.2021 |
|
Approved |
|
81 |
Operation & Management of Government Flying Training School And Development of Aviation Infrastructure at GFTS under Public Private Partnership (PPP) Framework
|
22 |
12.10.2021 |
DBFOT |
Approved |
|
82 |
Implementation and Management of Rural Infrastructure for Water Supply- Automated Rural Drinking Water Distribution System (ARDWDS)
|
22 |
12.10.2021 |
DBFOT |
Approved |
|
83 |
Development of District Stadia at Devenahalli (Bengaluru Rural) and Hospete |
22 |
12.10.2021 |
|
In-Principle Approval |
|
84 |
Animal Husbandry Dept
- Silage Making Unit in Lingadahalli and Hessargahtta
- Feed Concentrate Unit, Mineral mixture Unit & Feed Testing Laboratory at Dasenahalli
- Rendring Plant at Dasenahalli
- Theme Park at Kodi Halli, Doddaballapura
- O&M for slaughter house at Chiluvanahalli, Sira Tq
- Setting up Pashuloka Theme Park at Hesaragatta
|
22 |
12.10.2021 |
|
In-Principle Approval |
|
85 |
Fisheries Dept
- Sea Food Park at Gangolli, Machali & Baikampadi and Sea Food Park at Dakshina Kannada
- Cage Culture in Reservoirs across Karnataka
- Public Aquaria- O & M
- Fish Seed Production Farms
- Integrated Reservoir Fisheries Dev
- Cold Chain dev for Fisheries
- Tuna Fish Processing Unit at Mangalore
|
22 |
12.10.2021 |
|
In-Principle Approval |
|
86 |
Post Metric Girl Students Hostel in 15 locations across the State (Backward Classes Department)
|
22 |
12.10.2021 |
|
In-Principle Approval |
|
87 |
Horticulture Department
- Mango Processing Unit at Byrapatna, Ramanagara
- Horticulture Park, Koppal
|
22 |
12.10.2021 |
|
In-Principle Approval |
|
88 |
Youth Empowerment and Sports
- Construction of 6- Boy’s and 26 Girls’s Residential Sports Hostels and operations at District Head Quarters
- Upgradation of Adventure Sports facilities and operations at Udupi, Kunti Betta, Varlakonda and Murudeshwar
- Development of Taluka Stadiuma at 9 Taluka Head Quarters
- Development of Stadium in and around Bengaluru, at HSR layout and Tavarekere on Joint Venture basis with KSIIDC
- Setting up of Khelo India Sports Stadium on PPP mode at Tumakuru
- Development of District Stadium at Yadagir District
|
22 |
12.10.2021 |
|
In-Principle Approval |
|
89
|
ID,P&IWTD
1. Exploring potential of RORO/Passenger Ferry Services in Karnataka by identifying the routes and locations from Panaji to Mangalore on PPP Mode
2. Project Structuring for Resort Development at Mangalore |
22 |
12.10.2021 |
|
In-Principle Approval |
|
90 |
UDD
Development of Waste to Energy Unit on PPP Mode at waste disposal site belonging to Gadag-Betegere Municipality.
|
22 |
12.10.2021 |
|
In-Principle Approval |
|
91 |
Development of KSIIDC Land available at Balepura, Devanahalli Taluk on PPP mode
|
22 |
12.10.2021 |
|
In-Principle Approval |
|
92 |
Mudagal-Raichur via Pammanakalluru, Karital Road Devlopment |
22 |
12.10.2021 |
|
In-Principle Approval |
|
93 |
Development of Yashwantpur Land Parcel under PPP model (DBFOT) belonging to Karnataka Food and Civil Supplies Corporation Limited
|
23 |
24.08.2022 |
|
Approved |
|
94 |
Development of Dharwad Land Parcel under PPP model (DBFOT) belonging to Karnataka Food and Civil Supplies Corporation Limited
|
23 |
24.08.2022 |
|
Approved |
|
95 |
Development of eco-friendly tourismon PPP mode (DBFOT) at Manchanabele dam, Ramanagara district belonging to Cauvery Neeravari Nigam Limited
|
23 |
24.08.2022 |
|
Approved |
|
96 |
UDD (DULT)
Development of Commercial Complex at Hubli-Dharwad
|
23 |
24.08.2022 |
|
In-Principle Approval |
|
97 |
Transport Department
- Development of New Administrative Building along with Commercial complex at the existing Head office site at Kalaburagi on PPP mode
- Construction of Wayside Amenities at Mysore-Nanjangud road junction- Ratification
- Construction of Wayside Amenities at Amaravathi village, Hospet Taluk, Vijayanagara district- Ratification
- Construction of Wayside Amenities at 10 places identified besides Highways in Karnataka- Ratification
- Construction of Logistic Park or Truck Terminals at Anchatageri- Hubli and Dandeli - Ratification
|
23 |
24.08.2022 |
|
In-Principle Approval |
|
98 |
Sericulture Department
Development of Reshme Bhavan at Okalipuram, Rajajinagar, Bengaluru- Ratification
|
23 |
24.08.2022 |
|
In-Principle Approval |
|
99 |
Horticulture Department
- Establishment of an effective Cold Chain, Cold Storage, Advanced Dry and Wet Processing of Raisins with Colour Sorting and packing Machine – Implementation by Karnataka Wine Board
- Mango Processing Unit at Hangal Taluk, Haveri District
|
23 |
24.08.2022 |
|
In-Principle Approval |
|
100 |
Agriculture Department
Development of Food Park – Vijaapura
|
23 |
24.08.2022 |
|
In-Principle Approval |
|
101 |
AHF Department
- Modernization of 24/7 super speciality Veterinary Hospital in Queens road, Bengaluru
- Sexed Sorted Semen production Unit at Koppal
- Vaccination manufacturing facility project for food and mouth disease at Ramagondanahalli . Yelahanka
|
23 |
24.08.2022 |
|
In-Principle Approval |
|
102 |
PWD (KRDCL) Department
- Improvements to road from Yashodapura, Hunsur Talk of NH-275 junction (Kallubetta) to Kerala Border (SH-90) via SH-90 (Hunsur-Virajpet-Talakaveri Road) Thithimathi-Gonikoppa-Bittangala-Perambadi SH-91 (Kandimakki-Makutta road) Makutta-Kerala border, Mysuru & Kodagu District, Karnataka
- Improvements to road from Madikeri to Kutta (SH-89) via Siddapura-Palibetta-Gonikoppa-Ponnampete-Pudukeri-Sri Mangala in Kodagu district, Karnataka. Mysuru & Kodagu District, Karnataka.
|
23 |
24.08.2022 |
|
In-Principle Approval |
|
103 |
Tourism Department
- Development of Hampi-Badami-Aihole-Pattadakkallu-Vijaypur tourist circuit on public private partnership to promote tourism
- Development of Mysore-Srirangapatna-Hasana-Beluru-Halebid tourist circuit on public private partnership
|
23 |
24.08.2022 |
|
In-Principle Approval |
|
104 |
Food & Civil supplies Department
Development of land parcles of Karnataka Food and Civil Supplies Corporation at Mysore, Chitradurga, Kalaburagi (two locations), Bagalkote and Kadarenahalli in Bengaluru under PPP model.
|
23 |
24.08.2022 |
|
In-Principle Approval |
|
105 |
Kannada & Culture Department
Development of Karnataka Kalagram on PPP model to fully equip culturally and conduct continuous cultural activities.
|
23 |
24.08.2022 |
|
In-Principle Approval |
|
106 |
Development of Operation and Management of Modern Slaughterhouse at Cheelanahalli, Sira Taluk, Tumkur District
|
24 |
20.01.2023 |
DBFOT |
Approved |
|
107 |
Construction of a Multi-Storeyed Building for Central Office Space and Commercial Establishment through Design, Build, Finance, Operate and Transfer basis at Kalaburagi for Kalyana Karnataka Road Transport Corporation.
|
24 |
20.01.2023 |
DBFOT |
Approved |
|
108 |
Commerce & Industries Department
- Textiles Park at Ranebennur
- Textiles Park at Raichur
- Commercial building at Basavangudi, Bengaluru
|
24 |
20.01.2023 |
|
In-Principle Approval |
|