PPP Projects Approved by SLSWA and SHLCC

 

sl.no Name of the project SLSWA No. Dated Basis Detailed Remarks Present Position
1 Impovements to Dharwad-Alnawar-Ramnagar Road (SH-34) on BOT basis 1 19.09.2007 BOT Approved completed,COD Dec,2012
2 Construction of Expressway (State Highway,Special) from Outer Ring Road to International Airport in Devanahalli Taluk. 1 19.09.2007 BOT Approved  
3 Impovements to Chikkanayakanahalli-Tiptur-Hassan road (Partly MDR & partly SH) 1 19.09.2007 BOT Approved  
4 Improvements to State Highway (SH 10) from Maharashtra Border to Andhra Pradesh Border in Gulbarga District 1 19.09.2007 BOT Approved completed, Dec,2012
5 2nd Stage development of Karwar Port through Participation under "BOOT" concept: 2 20.11.2007 BOOST Approved  
6 Development of Honavar Port in District Uttara Kannada of Karnataka Martime State on Build Own Operate Share and Transfer (BOOST) basis 3 01.04.2008 BOOST Approved  
7 Development of Modern Sea Port at 1st Stage Malpe on the coastline of Karnataka Martime State on Buil Own Operate Share and Transfer (BOOST) basis 4 09.09.2008 BOOST Approved  
8 Development of Traffic and Transit Management Centre at Hebbal on DBOT basis. 4 09.09.2008 DBOT Approved  
9 Development of KSRTC offices, guesthouse and Commercial Complex on KSRTC site at Mangalore on PPP Basis 5 17.02.2009 DBOT Approved- under the common conditions as mentioned under 3.1.8 KRDCL-Transport department) completed, 2016
10 Commercial Development on KSRTC sites at Hassan and Channarayapatna on Public Private Partnership PPP Basis 5 17.02.2009 DBOT Approved- Hassan underthe common conditions as mentioned under 3.1.8.  
11 Development of Bus Station and Commercial Complex on KSRTC Site at Puttur on PPP basis 5 17.02.2009 DBOT Approved- Underthe common conditions as mentioned under 3.1.8.(KRDCL-Transport department) completed, 2016
12 Development of Passenger amenities and Commercial complex on KSRTC site at Chitradurga on PPP basis 5 17.02.2009 DBOT Approved- But informed to re-examine the necessity & requirement of each component now proposed.The common conditions as mentioned under 3.1.8.  
13 Development of bus Station and Commercial Complex on NWKRTC site at Hubli PPP basis 5 17.02.2009 DBOT But instructed that traffic impact assessment and management be reexamined before proceeding with further actions for bidding, subject to common conditions as mentioned under 3.1.8.Approved-  
14 Development of bus station and commercial complex on NWKRTC site at BELGAUM on PPP basis 5 17.02.2009 DBOT Approved- Underthe common conditions as mentioned under 3.1.8.  
15 Development of bus station and commercial complex on NEKRTC site at GULBARGA on PPP basis 5 17.02.2009 DBOT Approved- Under the common conditions as mentioned under 3.1.8.  
16 Establishment of KLAC office through development of 1.606 acres land at Hosur Main road, Bangalore on PPP basis 5 17.02.2009 BOT Approved  
17 Development of Ring road connecting Ananthpur Road and Bangalore Road at Bellary on PPP basis 5 17.02.2009 DBOT Approved- Committee asked the administrative agency to place the proposal before SHLCC.  
18 Development of Green Field Port under 'Swiss Challenge' at Haldipur by M/s. MEL,Bangalore 6 19.09.2009 Swiss challenge Approved- Permisssion to proceed with the necessary DPR studies & submit a detailed proposal to GOK.  
19 Development of Green Field Airport at Bellary 6 19.09.2009   Approved- The SWA advised IDD to seek VGF from GOI.  
20 Development of Intermodal Transit Center at Kempegowda Bus Station(KSRTC) 6 19.09.2009 BOT Approved- Since the project has far reaching consequences, SWA advised that a sub-committee headed by Principal Secretary, IDD inolving all the stake holders be constituted to take a view on the project on an expeditious basis.  
21 Railway Siding by JSW - Torangalu-Sulthanapura (11 km) Swamihalli (37 km) 7 19.04.2010   In principle approval given 1. IDD / KRIDE to proceed with DPR studies of the project,
2. to move the Ministry of Railways in matter.
3. To take forward the project on PPP mode, as & when Ministry of Railways clears the projects.
 
22 Industrial Park VADA 7 19.04.2010   In principle clearance given  
23 Gas Based Power Projects at Davanagere and Tumakuru 7 19.04.2010   In principle clearance given  
24 Talaguppa Honnavara, Bijapur – Shabhad, Dharwad – Belgaum Doubling 7 19.04.2010   In principle clearance given 1. IDD to go ahead in taking the project forward under PPP framework as and when the Ministry of Railways clears the project.
2. To explore the option of a line from Bagalkot to Shahabad
 
25 Logistic Architecture 7 19.04.2010   In principle approval given - Agreed that studies are required for development of these projects & gave its permission to go ahead with master plan / feasibility study.  
26 Bangalore Metro Phase-II 7 19.04.2010   Approved - for conducting studies  
27 City Gas Distribution 7 19.04.2010   Approved - 1. For forming a Joint venture with GAIL Gas ltd for providing gas distribution systems in Kar.
2. For appointment of KSIICD as a Nodal agency of the state.
3. Authorise IDD of GOK being nodal dept.
 
28 IMTC at Majestic Area 7 19.04.2010   Approved - 1. Implementation of IMTC project at Majestic area subject to the condition that KSRTC shll take action to establish satellite bus stations in all major roads leading to city at appropriate places in the vicinity of BBMP areas.  
29 SH-132 Road Project (Bellari city to Andhra Pradesh Border) 7 19.04.2010   Proceed- further as per cabinet approval. completed March,2014
30 Development of Sports, Lesiure and Recreation Centre in Peripharals of Bangalore 8 23.06.2010   In principle approval given - The committee agreed in principle for the Youth services dept to proceed further project development  
31 Development of Ring road and River Front Development in Mangalore (Mangala Corniche) 8 23.06.2010   In principle approval given 1. To take up the project on PPP.
2. KAP beappointed as Nodal Agency to implement the project
3. To retain KIPDC as project advisor to advise KAP in project development and implementation
 
32 (1). Development of Road from NH-63 - Ginigere - Gangavathi to Sindhanur

(2). Chintamani to Tadgal Road on to Andhra Pradesh Border in Chikkaballapura District (SH-82)

(3). Devasuguru - Chikkasuguru - Raichur - Yeragere to Manthralaya Bridge (SH-13)

(4). Lingasugur - Kalamala to Raichur(SH-20).

(5). Shivamogga - Honnalli to Harihara.
9 06.10.2010   Approved- i. To undertake the development / improvements of the above mentioned 5 project roads.
ii. To appoint KRDCL as the Nodal agency for implementation of the above Road projects.
iii. To avail the services of iDeCK as Project management Consultants for the above projects.
iv. To move GOI for VGF assistance in respect of the above projects.
v. To initiate all that action required to take forward the above projects in seeking the approvals of SHLCC and cabinet.
vi. To get all the bidding documents, transaction advisory documents prepared by the transaction advisors and get the same processed in the direction of inviting competitive bids in a transparent manner.
1 1) completed Sep,2015
33 Development of VADA under PPP Framwork through MISP 9 06.10.2010   In principle approval given i) Approval in-principle to undertake the development of VADA through MISP model.
ii)To appoint KSIIDC as the nodal agency to implement the VADA through MISP model.
iii)To appoint either iDeCK /other empanelled TA to develop the MISP concept in detail, phase out the investment to implement the scheme in3 phases and prepare necessary documents to invite Expression of Interests and selection of MISP partner.
iv)To suggest an appropriate land use planning for VADA taking into consideration the clearances already accorded for mega projects by the SLSWA, SHLCC and MoU’s entered into during GIM.
v)To initiate all that action required to take the project forward in moving the SHLCC and the Cabinet seeking the requisite approvals.
 
34 (1). Development of TTMC at Jayanagar 4th Block

(2).Development of TTMC at Indiranagar

(3). Development of TTMC at Kathriguppe

(4) Bus Terminal and Commercial Development at Malleshwaram
9 06.10.2010   In principle approval given- i. Clear the project in-principle for implementationunder PPP framework.
ii. Appoint BMTC as the nodal agency.
iii. Initiate all that action required to take the project forward.
iv.Move the SHLCC and the cabinet seeking the approval to take the project forwardunder the PPP framework.
v.Form an interface committee that will take up issues of importance to both concessioning authority and concessionaire.
 
35 Development of four Super Specality Hospital in Bengaluru 11 08.05.2012   In principle approval given  
36 Development of TTMC at Yelahanka and Electronic City 11 08.05.2012   In principle approval given  
37 Development of TTMC at Jayanagar 4th Block 11 08.05.2012   Approved  
38 Development of Commercial Complex in Gulbarga by GUDA 12 06.03.2013   Approved- To do the Analysis on Concession Payment  
39 Improvements to SH-62, 76, 57 from Hirekeruru to Ranebennur (on NH-04)- 58.3 km 12 06.03.2014   In principle approval given  
40 Improvements to Mundaragi-Hadagali-Harapanahalli-SH-45,47 12 06.03.2015   In principle approval given  
41 Improvements to Bantavala-Belthangadi SH-64 12 06.03.2016   In principle approval given  
42 Improvements to Yelahanka AP border Section 12 06.03.2013   Approved on going project, commercial operations started- October, 2018
43 Development of Road from Nelamangala to Chikkaballapura Section 12 06.03.2013   Approved  
44 Development of Road from Hosakote - Malur - TN Border 12 06.03.2013   Approved  
45 Instalation Commissioning and O&M of Municipal Solid Waste at Ramuhalli Post at Subbarayanapalya, Bengaluru 12 06.03.2013   In principle approval given  
46 Development of Belikeri port 14 27.11.2014   Approved  
47 Development of Commercial Complex at Mudabidre 15 23.05.2015   In principle approval given  
48 Development of Malavalli-Maddur-Huliyurudurga-Kunigal-Tumukuru-Koratagere-Madugiri-Pavagada Road 15 23.05.2016   Approved  
49 Development of Mudhol-Mahalingapura-Kabburu-Chikkodi-Nippani-Maharastra Border Road 15 23.05.2017   Approved  
50 Providing Tourism Infrastructure near Badra Dam 16 16.06.2016   Approved  
51 Providing Tourism Infrastructure near Hidkal Dam 16 16.06.2016   Approved  
52 Providing Tourism Infrastructure near Mallaprabha Dam 16 16.06.2016   Approved  
53 Setting of Blown Film Manufacturing Unit at Challaghatta 16 16.06.2016   In principle approval given  
54 Setting of Corrugated Box Manufacturing Unit at Challaghatta 16 16.06.2016   In principle approval given  
55 Deep freezer of Capacity 2000/3000 MT at Channarayapatna, 16 16.06.2016   In principle approval given  
56 Automated Milk Convertion Plants at Dharwad 16 16.06.2016   In principle approval given  
57 Automated Mega Cattel Feed Manufactruing Plant of Capacity 500 MT per day at Mandya and Kolar 16 16.06.2016   In principle approval given  
58 Ultra High trated - Health Drink project at Mandya 16 16.06.2016   In principle approval given  
59 Establishing of Solar Pannels on Rooftop of Storage Houses by KSWC 16 16.06.2016   In principle approval given- Approval was accorded to prepare DPR and placed before the Cabinet  
60 Tourism Infrastructure facility at Gorur Dam 16 16.06.2016   In principle approval given  
61 Tourism Infrastructure facility at Kabini Reservoir (Kabini Vanasiri) 16 16.06.2016   In principle approval given  
62 Development of seven Warehouses of KSWC as cold storages on PPP 18 11.01.2018   In principle approval given  
63 Operation and Maintenance of KSWC Warehouses on PPP 18 11.01.2018   Approved  
64 Development of bus terminal along with Commercial complex in Kanakapura bus stand 18 11.01.2018   Approved  
65 Setting up of Milk storage and packing unit at Sirsi 18 11.01.2018   Approved  
66

Development of Krishnaraja Sagar Brundavan Garden under PPP Model

20 26.11.2019   Approved  
67

Development of Aquarium under SWISS Chanllenge Model by Mysuru Zoo Authority

20 26.11.2019  SWISS Challenge Approved  
68

Development of Hullikere Garden under PPP Model at Koppal‌

20 26.11.2019   Approved  
69 Release of 3rd installment of KVGF -KRDCL - Yelahanka - A.P.Boarder 20 26.11.2019   Approved  
70

Development of Eco-Tourism at Manchinbele Dam (Ramanagara District)

20 26.11.2019   Approved  
71

Development of Health and Wellness City, Eco-Tourism City at Tadadi Port

20 26.11.2019   Approved  
 72

Development of Five Star Hotel Complex, Ropeway  and Stations  near Jog Falls  of Sagara Taluk on PPP model

21 09.06.2021  DBFOT  Approved  
 73  

Proposal of M/s BACL to develop Convention and Exhibition Centre at Kempegowda International Airport

 21  09.06.2021  BOOT  Approved  
 74  

Installation of PET CT Scan (Digital) Unit at KIDWAI Memorial Institute of Oncology

 

 21 09.06.2021   BOOT  Approved  
 75 Udupi Urban Digital Infrastructure Project 21 09.06.2021  

In-Principle Approval

 
 76  Development of Pheripheral Ring Road to Bangalore city  21  09.06.2021    Approved  
 77  

Road Project connecting Sindhanoor-Raichur-Hosur-Siddaram Pura-Gadwal Cross Road-Chandrabanda Cross Road-Drampura Cross Road and Yaramarus to  NH-167

 

 21 09.06.2021     Approved  
 78  

Development of Affordable Housing in PPP model for EWS/MIG-I/LIG/ Industrial & Service Sector Workers

 

 21  09.06.2021    

In-Principle Approval

 
 79  

Development and operation of Passenger Ropeways at Nandi Hills in Karnataka on DBFOT Basis

 22 12.10.2021  DBFOT  Approved  
 80  

Modernisation of Sree Kanteerava Sports Stadium Complex and Development of a Commercial Complex

 22 12.10.2021     Approved  
 81  

Operation & Management of Government Flying Training School And Development of Aviation Infrastructure at GFTS under Public Private Partnership (PPP) Framework

 22  12.10.2021  DBFOT  Approved  
 82  

Implementation and Management of Rural Infrastructure for Water Supply- Automated Rural Drinking Water Distribution System (ARDWDS)

 22 12.10.2021   DBFOT  Approved  
 83  Development of District Stadia at Devenahalli (Bengaluru Rural) and Hospete  22  12.10.2021    In-Principle Approval  
 84

 Animal Husbandry Dept

  1. Silage Making Unit in Lingadahalli and Hessargahtta
  2. Feed Concentrate Unit, Mineral mixture Unit & Feed Testing Laboratory at Dasenahalli
  3. Rendring Plant at Dasenahalli
  4. Theme Park at Kodi Halli, Doddaballapura
  5. O&M for slaughter house at Chiluvanahalli, Sira Tq
  6. Setting up Pashuloka Theme Park at Hesaragatta
 22  12.10.2021    In-Principle Approval  
 85

 Fisheries Dept

  1. Sea Food Park at Gangolli, Machali & Baikampadi and Sea Food Park at Dakshina Kannada
  2. Cage Culture in Reservoirs across Karnataka
  3. Public Aquaria- O & M
  4. Fish Seed Production Farms
  5. Integrated Reservoir Fisheries Dev
  6. Cold Chain dev for Fisheries
  7. Tuna Fish Processing Unit at Mangalore
  22  12.10.2021    In-Principle Approval  
 86  

Post Metric Girl Students Hostel in 15 locations across the State (Backward Classes Department)

  22 12.10.2021     In-Principle Approval  
 87

Horticulture Department

  1. Mango Processing Unit at Byrapatna, Ramanagara
  2. Horticulture Park, Koppal
 22  12.10.2021     In-Principle Approval  
 88

 Youth Empowerment and Sports

  1. Construction of 6- Boy’s and 26 Girls’s Residential Sports Hostels and operations at District Head Quarters
  2. Upgradation of Adventure Sports facilities and operations at Udupi, Kunti Betta, Varlakonda and Murudeshwar
  3. Development of Taluka Stadiuma at 9 Taluka Head Quarters
  4. Development of Stadium in and around Bengaluru, at HSR layout and Tavarekere on Joint Venture basis with KSIIDC
  5. Setting up of Khelo India Sports Stadium  on PPP mode at Tumakuru
  6. Development of District Stadium at Yadagir District
  22 12.10.2021     In-Principle Approval  

89

 

ID,P&IWTD

1. Exploring potential of RORO/Passenger Ferry Services in Karnataka by identifying the routes and locations  from Panaji to Mangalore on PPP Mode

2. Project Structuring for Resort Development at Mangalore
22 12.10.2021   In-Principle Approval  
90

UDD

Development of Waste to Energy Unit on PPP Mode at waste disposal site belonging to Gadag-Betegere Municipality.

22 12.10.2021   In-Principle Approval  
 91  

Development of KSIIDC Land available at Balepura, Devanahalli Taluk  on PPP mode

  22 12.10.2021     In-Principle Approval  
92 Mudagal-Raichur via Pammanakalluru, Karital Road Devlopment 22 12.10.2021   In-Principle Approval  
93

Development of Yashwantpur Land Parcel under PPP model (DBFOT) belonging to Karnataka Food and Civil Supplies Corporation Limited

23 24.08.2022    Approved  
94

Development of Dharwad Land Parcel under PPP model (DBFOT) belonging to Karnataka Food and Civil Supplies Corporation Limited

23 24.08.2022   Approved  
95

Development of eco-friendly tourismon PPP mode (DBFOT) at Manchanabele dam, Ramanagara district belonging to Cauvery Neeravari Nigam Limited

23 24.08.2022   Approved  
96

UDD (DULT)

Development of Commercial Complex at Hubli-Dharwad

23 24.08.2022   In-Principle Approval  
97

Transport Department

  1. Development of New Administrative Building along with Commercial complex at the existing Head office site at Kalaburagi on PPP mode
  2. Construction of Wayside Amenities at Mysore-Nanjangud road junction- Ratification
  3. Construction of Wayside Amenities at Amaravathi village, Hospet Taluk, Vijayanagara district- Ratification
  4. Construction of Wayside Amenities at 10 places identified besides Highways in Karnataka- Ratification
  5. Construction of Logistic Park or Truck Terminals at Anchatageri- Hubli and Dandeli - Ratification
23 24.08.2022   In-Principle Approval  
98

Sericulture Department

Development of Reshme Bhavan at Okalipuram, Rajajinagar, Bengaluru- Ratification

23 24.08.2022   In-Principle Approval  
99

Horticulture Department

  1. Establishment of an effective Cold Chain, Cold Storage, Advanced Dry and Wet Processing of Raisins with Colour Sorting and packing Machine – Implementation by Karnataka Wine Board    
  2. Mango Processing Unit at Hangal Taluk, Haveri District
23 24.08.2022   In-Principle Approval  
100

Agriculture Department

Development of Food Park – Vijaapura

23 24.08.2022   In-Principle Approval  
101

AHF Department

  1. Modernization of 24/7 super speciality Veterinary Hospital in Queens road, Bengaluru
  2. Sexed Sorted Semen production Unit at Koppal
  3. Vaccination manufacturing facility project for food and mouth disease at Ramagondanahalli . Yelahanka
23 24.08.2022   In-Principle Approval  
102

PWD (KRDCL) Department

  1. Improvements to road from Yashodapura, Hunsur Talk of NH-275 junction (Kallubetta) to Kerala Border (SH-90) via SH-90 (Hunsur-Virajpet-Talakaveri Road) Thithimathi-Gonikoppa-Bittangala-Perambadi SH-91 (Kandimakki-Makutta road) Makutta-Kerala border, Mysuru & Kodagu District, Karnataka
  2. Improvements to road from Madikeri to Kutta (SH-89) via Siddapura-Palibetta-Gonikoppa-Ponnampete-Pudukeri-Sri Mangala in Kodagu district, Karnataka. Mysuru & Kodagu District, Karnataka.
23 24.08.2022   In-Principle Approval  
103

Tourism Department

  1. Development of Hampi-Badami-Aihole-Pattadakkallu-Vijaypur tourist circuit on public private partnership to promote tourism
  2. Development of Mysore-Srirangapatna-Hasana-Beluru-Halebid tourist circuit on public private partnership
23 24.08.2022   In-Principle Approval  
104

Food & Civil supplies Department

Development of land parcles of Karnataka Food and Civil Supplies Corporation at Mysore, Chitradurga, Kalaburagi (two locations), Bagalkote and Kadarenahalli in Bengaluru under PPP model.

23 24.08.2022   In-Principle Approval  
105

Kannada & Culture Department

Development of Karnataka Kalagram on PPP model to fully equip culturally and conduct continuous cultural activities.

23 24.08.2022   In-Principle Approval  
106

Development of Operation and Management of Modern Slaughterhouse at Cheelanahalli, Sira Taluk, Tumkur District

 24 20.01.2023  DBFOT  Approved  
107  

Construction of a Multi-Storeyed Building for Central Office Space and Commercial Establishment through Design, Build, Finance, Operate and Transfer basis at Kalaburagi for Kalyana Karnataka Road Transport Corporation.

 24 20.01.2023  DBFOT  Approved  
108

Commerce & Industries Department

  1. Textiles Park at Ranebennur
  2. Textiles Park at Raichur
  3. Commercial building at Basavangudi, Bengaluru
 24 20.01.2023    In-Principle Approval  

 

Last Updated: 21-02-2023 01:35 PM Updated By: IDD Department


Disclaimer :

Please note that this page also provides links to the websites / web pages of Govt. Ministries/Departments/Organisations.The content of these websites are owned by the respective organisations and they may be contacted for any further information or suggestion

Website Policies

  • Copyright Policy
  • Hyperlinking Policy
  • Security Policy
  • Terms & Conditions
  • Privacy Policy
  • Help
  • Screen Reader Access
  • Guidelines

Visitors

  • Last Updated​ :
  • Visitors Counter :
  • Version :
CONTENT OWNED AND MAINTAINED BY : Infrastructure Development Ports & Inland Water Transport Department
Designed, Developed and Hosted by: Center for e-Governance - Web Portal, Government of Karnataka © 2023, All Rights Reserved.

Best viewed in Chrome v-87.0.4280.141, Microsoft Edge v-87.0.664.75, Firefox -v-83.0 Browsers. Resolution : 1280x800 to 1920x1080